in

pdf DIABLO CANYON POWER PLANT: STEAM GENERATOR REPAIR/REPLACEMENT COST/BENEFIT ANALYSIS

Downloads: 196 File Size: 83.6kB
Posted By: Highrad Views: 250
Date Added: 05-25-2007
Nuclear power plant steam generator replacement decisions involve roughly $1 B in capital and replacement power costs. SDG has been engaged in helping utilities make this type of decision for the past 20 years. For PG&E, we decided to change our analytic approach to include a Monte Carlo simulation. This paper discusses the results and the strengths and limitations of this analytic approach. Before this case, a California utility decision of this size had never included a Monte Carlo simulation. In contrast, another utility in California filed for steam generator replacement using a base case approach and has had very different results.

Filed under: , ,

Comments

No comments exist for this file.

Add Comment

(required) 
(required)
(optional)
(required) 
Add

Copyright (c) 2008 Nuclear Street
Terms and Conditions | Privacy | Copyright